Free tools Truckload
Fuel surcharge calculator
A fuel surcharge per mile is the diesel price minus the base price the contract sets, divided by the miles per gallon it assumes. Multiply that by the trip's miles for the surcharge on the load. The diesel price is usually the U.S. EIA's weekly on-highway average, and many contracts use a table instead of the division: $0.01 a mile for every $0.05 or $0.06 diesel is over the base.
- $0.420/mi
- Per mile
- 5.6%
- Of the linehaul
- $2.520/gal
- Over the base
Diesel prices for fuel surcharges this week
Retail diesel, Canada average, taxes included
CA$2.456/L
Source: Natural Resources Canada weekly average retail prices
At this week's $5.937 a gallon and the worked example's terms ($1.200 base, 6.0 mpg), the surcharge is $0.790 a mile: $385.52 on load 48213's 488 miles.
How a fuel surcharge is worked out
Over the base = diesel price (index) − base price, per gallon
Surcharge per mile = over the base ÷ miles per gallon
Surcharge on the trip = surcharge per mile × trip miles
Share of the linehaul = surcharge on the trip ÷ linehaul
- The index is usually the U.S. EIA's national average on-highway diesel price, published weekly; some contracts use a regional (PADD) average instead. The contract names the index and which week's price applies to a load.
- The base price (the peg) is where the program is neutral: at or below it there's no surcharge, and some programs pay a rebate below it. C.H. Robinson writes that pegs have long been set close to $1.20 a gallon.
- Miles per gallon is the program's assumption, not a truck's reading. C.H. Robinson puts trucks at 5 to 7 mpg; the lower the figure in the contract, the bigger the surcharge.
- Rounding is to a tenth of a cent a mile on this page, and the trip's surcharge is worked out from that rate, so the figures multiply out. Your contract may round to the cent.
Worked example
Load 48213's miles at an example diesel price.
Load 48213 runs 488 miles from Mississauga ON to Joliet IL on a $3,655.00 linehaul. At an example diesel price of $3.720 a gallon (an illustration, not this week's EIA price), a $1.200 base price and 6.0 mpg, diesel is $2.520 over the base: $2.520 ÷ 6.0 = $0.420 a mile. Over 488 miles that's $204.96, 5.6% of the linehaul.
On a table instead, the same price is 42 six-cent steps, so $0.420 a mile and $204.96 for the trip; a five-cent table gives $0.500 a mile, $244.00.
48213's own invoice carries fuel as a separate $560.00 line from its quote, so it doesn't move with the index. This example is a separate illustration of a per-mile program on the same miles, not a recalculation of that line.
Canadian example
A per-kilometre surcharge on NRCan's price.
A Canadian contract may follow NRCan's weekly average instead of the EIA's, priced in dollars a litre and charged per kilometre. The formula is the same in metric units: the price minus the base, times the litres per 100 km the contract assumes, divided by 100, is the surcharge per kilometre.
At NRCan's CA$2.456 a litre for the week ending November 17, 2026, an example base of CA$1.250 and an example 40 L/100 km (about 5.9 mpg), diesel is CA$1.206 over the base: CA$1.206 × 40 ÷ 100 = CA$0.482 a kilometre. Over a 550 km run that's CA$265.10.
NRCan's averages include taxes. The contract says whether the index is taken with taxes or without, and which week's price applies to a load.
The table method
- A $0.06 step works out the same as dividing by 6 mpg, rounded down to a whole cent. It's often called a six-cent ratio.
- A $0.05 step is the same as 5 mpg, so it pays more: in C.H. Robinson's white paper, a $3.00 rise over the peg is $0.50 a mile on a six-cent ratio and $0.60 on a five-cent one.
- Both methods start from the same index and base price. Only the step, or the miles per gallon, changes the answer.
Surcharge per mile at a glance
| Diesel price | ÷ 6.0 mpg | ÷ 6.5 mpg | ÷ 7.0 mpg | Table, $0.06 step | Table, $0.05 step |
|---|---|---|---|---|---|
| $3.000 | $0.300 | $0.277 | $0.257 | $0.300 | $0.360 |
| $3.250 | $0.342 | $0.315 | $0.293 | $0.340 | $0.410 |
| $3.500 | $0.383 | $0.354 | $0.329 | $0.380 | $0.460 |
| $3.750 | $0.425 | $0.392 | $0.364 | $0.420 | $0.510 |
| $4.000 | $0.467 | $0.431 | $0.400 | $0.460 | $0.560 |
| $4.250 | $0.508 | $0.469 | $0.436 | $0.500 | $0.610 |
| $4.500 | $0.550 | $0.508 | $0.471 | $0.550 | $0.660 |
Tables add $0.01 a mile for each full step over the base.
Where the numbers come from
Sources
- U.S. Energy Information Administration: Gasoline and Diesel Fuel Update (weekly on-highway diesel prices)eia.gov
- Natural Resources Canada: Weekly average retail prices for diesel, Canada (cents a litre, taxes included)www2.nrcan.gc.ca
- C.H. Robinson: Truckload Fuel Surcharges, How They Work and What They Cost (white paper)supplychainbrain.com
- C.H. Robinson: Making Sense of Truckload Surcharges: Index, Peg, & Escalatorchrobinson.com
Free tool
Fuel surcharge questions
What is a fuel surcharge in trucking?
A charge on top of the linehaul that moves with the price of diesel, so the carrier doesn't carry the fuel price risk alone. It's usually worked out per mile from a published diesel index, a base price and an assumed miles per gallon, and shown as its own line on the invoice.
Which diesel price do fuel surcharges use?
Most use the U.S. Energy Information Administration's weekly national average on-highway diesel price, often still called the DOE price since the EIA is part of the Department of Energy. Some use a regional (PADD) average. The contract says which index and which week's price applies.
How is a fuel surcharge worked out in Canada?
The same way, in metric units where the contract uses them: the index price minus the base price, times the litres per 100 km the contract assumes, divided by 100, is the surcharge per kilometre. A contract that follows Natural Resources Canada's weekly average retail diesel price uses it in dollars a litre; NRCan publishes it in cents a litre, taxes included.
What base price should a fuel surcharge use?
Whatever the contract sets. The base, or peg, is the diesel price at which the surcharge is zero. A lower base or a lower miles-per-gallon figure means a bigger surcharge, so both are negotiated along with the linehaul rate.
What does "a cent a mile for every 6 cents" mean?
It's a table-based surcharge: each full $0.06 the diesel price is over the base adds $0.01 a mile. That works out the same as dividing by 6 mpg, rounded down to a whole cent. A five-cent table works like 5 mpg and pays more.
Can a fuel surcharge be a percentage of the linehaul?
Yes, some programs charge a percentage of the linehaul instead of a rate per mile. The calculator shows the per-mile surcharge as a share of the linehaul, so the two can be compared on the same load.
Which week's diesel price should a fuel surcharge use?
The one the contract names: it says which index (national or regional) and which week's price applies to a load, such as the week it picks up. This page shows the latest EIA and NRCan weekly figures with their dates; for an earlier load, take the price for that load's week from the publisher's history.
In Roadmark, the fuel surcharge is its own line on the invoice and on an owner-operator's settlement.
Settlements are drafted from the same loads as the invoice, with each load's fuel surcharge beside its revenue.
More free calculators
Dimensional weight calculator
Actual against volumetric weight for an air shipment, at IATA's 6,000 cm³/kg or 166 in³/lb, line by line.
Freight class calculator
Density in pounds per cubic foot for each pallet, and the class the NMFC's 13-sub density scale gives it.
Truck detention time calculator
What a truck's time at the dock past its free time comes to, on the invoice and on the driver's pay.
Container demurrage and per diem calculator
Last free day, charged days and the total for a container at the terminal or out on per diem, with tiered rates.
Trucking cost per mile calculator
A truck's fixed and per-mile costs over the miles it runs, as a cost per mile, and the margin at a rate per mile.
Cross-dock fee calculator
A cross-dock visit's bill: handling per pallet in and out, the minimum, storage after the free time and extras, per pallet and against what you charge.
Let Roadmark work it out on every load.
Bring a week of your own loads. We'll show you the detention, weights, classes and free-time charges Roadmark would have worked out from your ELD times, dimensions and terminal dates.
- Worked from your own loads, not a script
- Every figure shown with where it came from
- Runs beside the TMS you have today